Arc: Daylight saving time in chore incorrect

Hi,

After the clocks changed to summer time last Sunday, the chores in Arc did not take this into consideration.

The chore shown in the screenshot effectively runs at 10:15 and not at the displayed Start Time of 09:15 which is correct as CEST is equal to UTC +2 now.

Before the switch to summer time the chore was scheduled for 09:15 UTC to start at 10:15 CET. After the switch the chore started at 11:15 CET, so I had to reschedule it to 08:15 UTC for it to start at the desired time of 10:15 CEST.

Anyone else with a similar experience?

Arc version is 5.2.1

Alex